Total installed electric output:

3MW/h (3x 1MW)

Biogas plants were put into operation during the year 2013.

Input material - combination of agricultural biomass, by-products and biodegradable waste.

Contact: Mr. Bán / +421 910 910 797 / This email address is being protected from spambots. You need JavaScript enabled to view it.

Total installed electric output:

2MW/h (2x 1MW)

The first biogas plant was successfully put into operaton at the end of the 2012 and the second one exactly a year later.

Input material - mostly by-products from the food production sector and biodegradable waste with a smaller share of agricultural biomass.

Contact: Mr. Kulich / +421 907 953 679 / This email address is being protected from spambots. You need JavaScript enabled to view it.

Total installed electric power:

3MW/h (2x 1MW + 2x 0,5MW)

First biogas plant put into operation in 2010.

Completion of the compex in December 2013.

Input material: combination of agricultural biomass with by-products and biodegradable waste.