Total installed electric output:

2MW/h (2x 1MW)

The first biogas plant was successfully put into operaton at the end of the 2012 and the second one exactly a year later.

Input material - mostly by-products from the food production sector and biodegradable waste with a smaller share of agricultural biomass.

Contact: Mr. Kulich / +421 907 953 679 / This email address is being protected from spambots. You need JavaScript enabled to view it.

 

Hore